PROJECTS

Modern Kitchen Project at GHA Hospital, Egypt – 2020

In late 2020, Way Engineering Consultancy LLC successfully transformed two old storage rooms at GHA hospital, into a fully functional modern kitchen. This project aimed to enhance food service quality for hospital inpatients, staff, and guests, while adhering to the required hospital hygiene and safety standards.

Key Highlights:

  1. Comprehensive Design & Renovation:
    • Conducted initial feasibility studies and developed a modern kitchen layout.
    • Renovated the space, including electrical upgrades, improved ventilation, and hygienic finishes to ensure compliance with hospital standards.
  2. Modern Equipment Installation:
    • Installed advanced electric kitchen appliances and equipment to enhance operational efficiency and reliability.
  3. Project Scope & Duration:
    • The project, completed within 3 months, involved a total cost of $35,000, delivering a high-quality facility on time and within budget.

Conclusion:
This successful transformation significantly improved food preparation and service capabilities at GHA hospital, directly benefiting patients, staff, and guests, while meeting international safety and hygiene benchmarks.

kitchen 2

Project Summary: Renovation of EMHA hospital Basement 2021

Way Engineering Consultancy successfully transformed an 80 m² basement at the EMHA hospital, previously used for storage, into a functional space for improved hospital logistics. The project, completed in December 2021, included:

  • Steel Mezzanine Addition: Doubling usable space by creating a 2-meter-high upper level.
  • Office Spaces: Three offices for the Engineering, Maintenance, and Logistics departments.
  • Optimized Storage: Enhanced organization on the lower level.

With a budget of $20,000 and a 3-month timeline, this renovation significantly improved the hospital’s operational efficiency and storage capacity.

hospital under construction

Project Summary: Observation Room Renovation at EMHA Hospital, Egypt 2022

This project involved transforming two office spaces into a fully equipped observation room at EMHA Hospital. The room now accommodates five patient beds, a nursing station, oxygen supply lines, and a crash cart for emergency care. The renovation improved patient monitoring and staff efficiency, enhancing the hospital’s capacity to handle emergencies and routine care.

  • Budget: $9,000 (renovation + medical equipment)
  • Key Features: 5 patient beds, nursing station, oxygen lines, emergency crash cart
  • Completion: Delivered in just 15 days.
hospital under construction t

Project Summary: Renovation and Upgrading radiology department of GHA Hospital, Egypt

Way Engineering Consultancy successfully delivered a $161,000 development project at GHA, Egypt, from August 2021 to February 2022. Key achievements include:

  • Radiology Department Renovation:Creation of new rooms for Ultrasound, X-ray, and a Siemens CT scanner, along with a modern image processing room equipped with advanced systems for precise diagnostics.
  • Low Current Network Renewal:The department’s low current network was completely upgraded, incorporating state-of-the-art systems to enhance connectivity, data management, and operational efficiency.
  • UPS Installation:Reliable uninterruptible power supply (UPS) systems were installed for the Radiology Department, control room, and the doctor’s office, ensuring seamless operations and protection against power disruptions.

This project significantly advanced the hospital’s diagnostic infrastructure and reliability, reinforcing Way Engineering Consultancy’s expertise in healthcare facility enhancement.

Project Summary: Advisory Role in Reducing Maternal and Child Mortality at EM Hospital, Malawi

Way Engineering Consultancy contributed as advisors to the initiative aimed at reducing maternal and child mortality at EM Hospital in northern Malawi. Our advisory role focused on providing strategic guidance to support the hospital’s infrastructure improvements, staff training programs, and community engagement efforts.

Key advisory contributions included:

  • Infrastructure Recommendations: Guidance on renovating the maternity ward, expanding delivery rooms, and upgrading sanitation facilities to align with modern healthcare standards.
  • Equipment Procurement: Advising on acquiring critical diagnostic tools, including ultrasound machines, to enhance pregnancy care and early complication detection.
  • Staff Training Development: Providing input on designing training programs in obstetric and neonatal care, family planning, and emergency response to strengthen healthcare delivery.
  • Community Outreach Strategy: Recommending health education campaigns to encourage antenatal care and promote safe hospital births.

As advisors, our involvement helped shape a sustainable approach to improving maternal and child health outcomes, strengthening the hospital’s role as a vital healthcare provider for the region.

EM Hospital, Malawi

Feasibility Study: Establishing a Neonatal Intensive Care Unit (NICU) at EMHA Hospital, Egypt

Establishing a Neonatal Intensive Care Unit (NICU) at EMHA Hospital, Egypt

Way Engineering Consultancy LLC conducted a feasibility study for transforming six patient rooms into a 120-square-meter Neonatal Intensive Care Unit (NICU). The proposed design accommodates six incubators, a staff workstation, family seating, and storage, ensuring compliance with healthcare standards.

Key Contributions:

  1. Design & Equipment: Optimized layout with soundproofing, lighting, temperature control, and advanced equipment like incubators, monitors, and phototherapy units.
  2. Renovation Guidance: Identified structural needs for renovations ($12,000) and ensured adherence to regulations and infection control protocols.
  3. Budget & Timeline: Estimated a total cost of $77,000 and a 4-5 month completion timeline, including planning, renovation, equipment installation, and training.
  4. Training: Emphasized staff training on NICU protocols and equipment operation.

Conclusion:
The study provides a clear plan for establishing a NICU, enhancing neonatal care and survival rates. It serves as a strategic framework for EMHA Hospital to mobilize resources and implement this critical project.

 

SHAC Clinics Project – South Egypt

Since 2018, Way Engineering Consultancy LLC has been actively involved in the development of the SHAC Clinics project in South Egypt. This initiative is a large-scale, charity-based undertaking aimed at providing essential healthcare services in one of the most underserved regions of the country.

Project Overview:

  1. Scope of Services:
    • Conducted a comprehensive feasibility study and designed the medical center layout.
    • Supervised and followed up on the construction phases, ensuring adherence to safety and quality standards.
  2. Key Features:
    • A fully equipped clinic to provide primary and specialized medical care.
    • An operation room to handle minor surgeries and emergency procedures.
    • On-site accommodation facilities for the medical team, enabling continuous care for the community.
  3. Budget & Progress:
    • The estimated project budget is $200,000.
    • Construction is ongoing, reflecting the project’s scale and reliance on charitable funding for progress.

Impact:
Once completed, the SHAC Clinics will serve as a vital healthcare facility in an area with dire living conditions, providing access to medical care for the most vulnerable populations. This project exemplifies a commitment to improving health outcomes and supporting sustainable development in South Egypt.

SHAC Clinics Project – South Egypt

Send Us a Message